Back to results

Bradfield vs Currambine vs Deanside — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $1.00Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Bradfield

    NSW · 2556
    58Average
    Median
    $1.00M
    5y growth
    5.0%/yr
    YieldStable but fully priced
  2. Currambine

    WA · 6028
    64Strong
    Median
    $745k
    5y growth
    11.2%/yr
    GrowthStable entry point
  3. Deanside

    VIC · 3336
    63Strong
    Median
    $660k
    5y growth
    14.5%/yr
    GrowthStable entry point

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Bradfield
Currambine
Deanside
Capital growth (5y)
weight 22%
505.0%/yr
10011.2%/yr
10014.5%/yr
Rental yield
weight 13%
804.0%
562.8%
633.2%
Rental demand
weight 10%
681.3%
701.2%
651.4%
Population growth
weight 12%
656.5%
10012.6%
787.8%
Income growth
weight 12%
6015.0%
6416.0%
6416.0%
Construction pipeline
weight 15%
61$3.0bn
0
0
Affordability
weight 8%
0Over cap
2626% under cap
3434% under cap
Supply tightening
weight 8%
70-4.0% YoY
70-4.0% YoY
80-6.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Bradfield

    2/8
    • Rental yield
    • Construction pipeline
  2. Currambine

    2/8
    • Rental demand
    • Population growth
  3. Deanside

    2/8
    • Affordability
    • Supply tightening

Why Bradfield

Stable but fully priced

4.0% gross yield, listings tightening 4.0% YoY.

Drivers
  • Rental yield4.0%
  • Supply tightening-4.0% YoY
  • Tight rentals1.3%
  • Population growth+6.5% (5y)
Risks
  • At top of budget (100% of cap)

Construction ·Sydney Metro — Western Sydney Airport4.1 kmConstruction · 2026

Why Currambine

Stable entry point

11.2%/yr capital growth, population +12.6% (5y).

Drivers
  • Capital growth11.2%/yr
  • Population growth+12.6% (5y)
  • Tight rentals1.2%
  • Supply tightening-4.0% YoY
Risks
  • No major construction project in this state

Why Deanside

Stable entry point

14.5%/yr capital growth, listings tightening 6.0% YoY.

Drivers
  • Capital growth14.5%/yr
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Tight rentals1.4%
Risks
  • No major construction project in this state

Construction ·Melbourne Airport Rail — Sunshine Hub16.5 kmApproved · 2033