Back to results

Lower Macdonald vs Baldivis vs Sunshine — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $1.20Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Lower Macdonald

    NSW · 2775
    59Average
    Median
    $195k
    5y growth
    5.0%/yr
    YieldStable entry · room to scale
  2. Baldivis

    WA · 6171
    66Strong
    Median
    $645k
    5y growth
    12.2%/yr
    GrowthStable entry · room to scale
  3. Sunshine

    VIC · 3020
    69Strong
    Median
    $825k
    5y growth
    7.5%/yr
    GrowthStable entry point

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Lower Macdonald
Baldivis
Sunshine
Capital growth (5y)
weight 22%
505.0%/yr
10012.2%/yr
757.5%/yr
Rental yield
weight 13%
1008.3%
582.9%
432.1%
Rental demand
weight 10%
681.3%
701.2%
651.4%
Population growth
weight 12%
656.5%
10012.6%
787.8%
Income growth
weight 12%
6416.0%
6416.0%
6416.0%
Construction pipeline
weight 15%
0
0
100$9.1bn
Affordability
weight 8%
8484% under cap
4646% under cap
3131% under cap
Supply tightening
weight 8%
75-5.0% YoY
70-4.0% YoY
80-6.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Lower Macdonald

    2/8
    • Rental yield
    • Affordability
  2. Baldivis

    3/8
    • Capital growth (5y)
    • Rental demand
    • Population growth
  3. Sunshine

    2/8
    • Construction pipeline
    • Supply tightening

Why Lower Macdonald

Stable entry · room to scale

8.3% gross yield, 84% under your cap.

Drivers
  • Rental yield8.3%
  • Budget headroom84% under cap
  • Supply tightening-5.0% YoY
  • Tight rentals1.3%
Risks
  • No major construction project in this state

Construction ·Sydney Metro West — Parramatta50.2 kmConstruction · 2030

Why Baldivis

Stable entry · room to scale

12.2%/yr capital growth, population +12.6% (5y).

Drivers
  • Capital growth12.2%/yr
  • Population growth+12.6% (5y)
  • Tight rentals1.2%
  • Supply tightening-4.0% YoY
Risks
  • No major construction project in this state

Why Sunshine

Stable entry point

$9.1bn pipeline incl. Melbourne Airport Rail — Sunshine Hub, listings tightening 6.0% YoY.

Drivers
  • Infrastructure pipeline$9.1bn nearby
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Capital growth7.5%/yr
Risks
  • Thin gross yield (2.1%)

Construction ·Melbourne Airport Rail — Sunshine Hub0.0 kmApproved · 2033