Back to results

Preston vs Pearcedale vs Seddon — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $1.20Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Preston

    VIC · 3072
    56Average
    Median
    $985k
    5y growth
    7.0%/yr
    GrowthGrowth-led, low cashflow
  2. Pearcedale

    VIC · 3912
    57Average
    Median
    $1.02M
    5y growth
    9.2%/yr
    GrowthGrowth-led, low cashflow
  3. Seddon

    VIC · 3011
    56Average
    Median
    $965k
    5y growth
    0.1%/yr
    BalancedLate-cycle hold

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Preston
Pearcedale
Seddon
Capital growth (5y)
weight 22%
707.0%/yr
929.2%/yr
10.1%/yr
Rental yield
weight 13%
412.1%
412.0%
502.5%
Rental demand
weight 10%
701.2%
681.3%
681.3%
Population growth
weight 12%
787.8%
787.8%
787.8%
Income growth
weight 12%
8822.0%
6416.0%
8421.0%
Construction pipeline
weight 15%
0
0
100$6.8bn
Affordability
weight 8%
1818% under cap
1515% under cap
2020% under cap
Supply tightening
weight 8%
90-8.0% YoY
80-6.0% YoY
85-7.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Preston

    3/8
    • Rental demand
    • Income growth
    • Supply tightening
  2. Pearcedale

    1/8
    • Capital growth (5y)
  3. Seddon

    3/8
    • Rental yield
    • Construction pipeline
    • Affordability

Why Preston

Growth-led, low cashflow

listings tightening 8.0% YoY, incomes +22.0% (5y).

Drivers
  • Supply tightening-8.0% YoY
  • Income growth+22.0% (5y)
  • Population growth+7.8% (5y)
  • Capital growth7.0%/yr
Risks
  • Thin gross yield (2.1%)
  • No major construction project in this state

Construction ·Metro Tunnel — Parkville Station6.4 kmRecently completed · 2025

Why Pearcedale

Growth-led, low cashflow

9.2%/yr capital growth, listings tightening 6.0% YoY.

Drivers
  • Capital growth9.2%/yr
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Tight rentals1.3%
Risks
  • Thin gross yield (2.0%)
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Cheltenham30.2 kmConstruction · 2035

Why Seddon

Late-cycle hold

$6.8bn pipeline incl. West Gate Tunnel, listings tightening 7.0% YoY.

Drivers
  • Infrastructure pipeline$6.8bn nearby
  • Supply tightening-7.0% YoY
  • Income growth+21.0% (5y)
  • Population growth+7.8% (5y)
Risks
  • Thin gross yield (2.5%)
  • Modest 5y growth (0.1%/yr)

Construction ·New Footscray Hospital1.0 kmConstruction · 2026