Back to results

Box Hill vs Logan Central — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $1.50Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Box Hill

    VIC · 3128
    61Strong
    Median
    $1.50M
    5y growth
    5.8%/yr
    GrowthStable but fully priced
  2. Logan Central

    QLD · 4114
    67Strong
    Median
    $575k
    5y growth
    9.4%/yr
    GrowthStable entry · room to scale

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Box Hill
Logan Central
Capital growth (5y)
weight 22%
585.8%/yr
949.4%/yr
Rental yield
weight 13%
271.3%
512.5%
Rental demand
weight 10%
651.4%
701.2%
Population growth
weight 12%
787.8%
10010.0%
Income growth
weight 12%
6416.0%
7218.0%
Construction pipeline
weight 15%
100$5.0bn
0
Affordability
weight 8%
00% under cap
6262% under cap
Supply tightening
weight 8%
75-5.0% YoY
85-7.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Box Hill

    1/8
    • Construction pipeline
  2. Logan Central

    7/8
    • Capital growth (5y)
    • Rental yield
    • Rental demand
    • Population growth
    • Income growth
    • Affordability
    • Supply tightening

Why Box Hill

Stable but fully priced

$5.0bn pipeline incl. Suburban Rail Loop East — Box Hill, population +7.8% (5y).

Drivers
  • Infrastructure pipeline$5.0bn nearby
  • Population growth+7.8% (5y)
  • Supply tightening-5.0% YoY
  • Tight rentals1.4%
Risks
  • At top of budget (100% of cap)
  • Thin gross yield (1.3%)

Construction ·Suburban Rail Loop East — Box Hill0.0 kmConstruction · 2035

Why Logan Central

Stable entry · room to scale

population +10.0% (5y), 9.4%/yr capital growth.

Drivers
  • Population growth+10.0% (5y)
  • Capital growth9.4%/yr
  • Supply tightening-7.0% YoY
  • Income growth+18.0% (5y)
Risks
  • No major construction project in this state

Construction ·Cross River Rail — Boggo Road17.9 kmConstruction · 2026