Back to results

Clayton vs South Brisbane — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $1.50Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Clayton

    VIC · 3168
    66Strong
    Median
    $1.25M
    5y growth
    7.1%/yr
    GrowthStable entry point
  2. South Brisbane

    QLD · 4101
    71Strong
    Median
    $1.50M
    5y growth
    9.4%/yr
    GrowthStable but fully priced

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Clayton
South Brisbane
Capital growth (5y)
weight 22%
717.1%/yr
949.4%/yr
Rental yield
weight 13%
331.7%
331.6%
Rental demand
weight 10%
681.3%
701.2%
Population growth
weight 12%
787.8%
10010.0%
Income growth
weight 12%
6416.0%
7218.0%
Construction pipeline
weight 15%
100$5.0bn
75$3.8bn
Affordability
weight 8%
1717% under cap
00% under cap
Supply tightening
weight 8%
80-6.0% YoY
85-7.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Clayton

    3/8
    • Rental yield
    • Construction pipeline
    • Affordability
  2. South Brisbane

    5/8
    • Capital growth (5y)
    • Rental demand
    • Population growth
    • Income growth
    • Supply tightening

Why Clayton

Stable entry point

$5.0bn pipeline incl. Suburban Rail Loop East — Clayton, listings tightening 6.0% YoY.

Drivers
  • Infrastructure pipeline$5.0bn nearby
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Capital growth7.1%/yr
Risks
  • Thin gross yield (1.7%)

Construction ·Suburban Rail Loop East — Clayton0.0 kmConstruction · 2035

Why South Brisbane

Stable but fully priced

population +10.0% (5y), 9.4%/yr capital growth.

Drivers
  • Population growth+10.0% (5y)
  • Capital growth9.4%/yr
  • Supply tightening-7.0% YoY
  • Infrastructure pipeline$3.8bn nearby
Risks
  • At top of budget (100% of cap)
  • Thin gross yield (1.6%)

Construction ·Brisbane Metro1.0 kmConstruction · 2025