Why Heidelberg
Stable entry point$6.1bn pipeline incl. North East Link — Bulleen, listings tightening 7.0% YoY.
- Infrastructure pipeline$6.1bn nearby
- Supply tightening-7.0% YoY
- Population growth+7.8% (5y)
- Income growth+17.0% (5y)
- Thin gross yield (1.6%)
Construction ·North East Link — Bulleen2.0 kmConstruction · 2028