Back to results

Milton vs Spotswood vs Heidelberg — which is best for growth?

Same eight metrics, scored against the same benchmark, ranked against a $1.50Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Milton

    QLD · 4064
    68Strong
    Median
    $1.50M
    5y growth
    9.2%/yr
    GrowthStable but fully priced
  2. Spotswood

    VIC · 3015
    60Strong
    Median
    $1.08M
    5y growth
    2.6%/yr
    BalancedLate-cycle hold
  3. Heidelberg

    VIC · 3084
    64Strong
    Median
    $1.29M
    5y growth
    5.8%/yr
    GrowthStable entry point

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Milton
Spotswood
Heidelberg
Capital growth (5y)
weight 22%
929.2%/yr
262.6%/yr
585.8%/yr
Rental yield
weight 13%
301.5%
442.2%
321.6%
Rental demand
weight 10%
681.3%
681.3%
681.3%
Population growth
weight 12%
10010.0%
787.8%
787.8%
Income growth
weight 12%
8020.0%
8421.0%
6817.0%
Construction pipeline
weight 15%
60$3.0bn
91$4.6bn
100$6.1bn
Affordability
weight 8%
00% under cap
2828% under cap
1414% under cap
Supply tightening
weight 8%
80-6.0% YoY
85-7.0% YoY
85-7.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Milton

    2/8
    • Capital growth (5y)
    • Population growth
  2. Spotswood

    3/8
    • Rental yield
    • Income growth
    • Affordability
  3. Heidelberg

    1/8
    • Construction pipeline

Why Milton

Stable but fully priced

population +10.0% (5y), 9.2%/yr capital growth.

Drivers
  • Population growth+10.0% (5y)
  • Capital growth9.2%/yr
  • Income growth+20.0% (5y)
  • Supply tightening-6.0% YoY
Risks
  • At top of budget (100% of cap)
  • Thin gross yield (1.5%)

Construction ·Cross River Rail — Roma Street1.3 kmConstruction · 2026

Why Spotswood

Late-cycle hold

$4.6bn pipeline incl. West Gate Tunnel, listings tightening 7.0% YoY.

Drivers
  • Infrastructure pipeline$4.6bn nearby
  • Supply tightening-7.0% YoY
  • Income growth+21.0% (5y)
  • Population growth+7.8% (5y)
Risks
  • Thin gross yield (2.2%)
  • Modest 5y growth (2.6%/yr)

Construction ·West Gate Tunnel1.7 kmConstruction · 2025

Why Heidelberg

Stable entry point

$6.1bn pipeline incl. North East Link — Bulleen, listings tightening 7.0% YoY.

Drivers
  • Infrastructure pipeline$6.1bn nearby
  • Supply tightening-7.0% YoY
  • Population growth+7.8% (5y)
  • Income growth+17.0% (5y)
Risks
  • Thin gross yield (1.6%)

Construction ·North East Link — Bulleen2.0 kmConstruction · 2028