Back to results

Morwell vs Heidelberg vs Pearcedale — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $1.50Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Morwell

    VIC · 3840
    59Average
    Median
    $314k
    5y growth
    11.9%/yr
    GrowthStable entry · room to scale
  2. Heidelberg

    VIC · 3084
    64Strong
    Median
    $1.29M
    5y growth
    5.8%/yr
    GrowthStable entry point
  3. Pearcedale

    VIC · 3912
    58Average
    Median
    $1.02M
    5y growth
    9.2%/yr
    GrowthGrowth-led, low cashflow

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Morwell
Heidelberg
Pearcedale
Capital growth (5y)
weight 22%
10011.9%/yr
585.8%/yr
929.2%/yr
Rental yield
weight 13%
713.6%
321.6%
412.0%
Rental demand
weight 10%
402.4%
681.3%
681.3%
Population growth
weight 12%
787.8%
787.8%
787.8%
Income growth
weight 12%
5213.0%
6817.0%
6416.0%
Construction pipeline
weight 15%
0
100$6.1bn
0
Affordability
weight 8%
7979% under cap
1414% under cap
3232% under cap
Supply tightening
weight 8%
25+5.0% YoY
85-7.0% YoY
80-6.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Morwell

    3/8
    • Capital growth (5y)
    • Rental yield
    • Affordability
  2. Heidelberg

    3/8
    • Income growth
    • Construction pipeline
    • Supply tightening
  3. Pearcedale

    0/8

    No outright lead on any single dimension.

Why Morwell

Stable entry · room to scale

11.9%/yr capital growth, 79% under your cap.

Drivers
  • Capital growth11.9%/yr
  • Budget headroom79% under cap
  • Population growth+7.8% (5y)
  • Rental yield3.6%
Risks
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley116.0 kmConstruction · 2035

Why Heidelberg

Stable entry point

$6.1bn pipeline incl. North East Link — Bulleen, listings tightening 7.0% YoY.

Drivers
  • Infrastructure pipeline$6.1bn nearby
  • Supply tightening-7.0% YoY
  • Population growth+7.8% (5y)
  • Income growth+17.0% (5y)
Risks
  • Thin gross yield (1.6%)

Construction ·North East Link — Bulleen2.0 kmConstruction · 2028

Why Pearcedale

Growth-led, low cashflow

9.2%/yr capital growth, listings tightening 6.0% YoY.

Drivers
  • Capital growth9.2%/yr
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Tight rentals1.3%
Risks
  • Thin gross yield (2.0%)
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Cheltenham30.2 kmConstruction · 2035