Back to results

Parramatta vs Stafford — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $1.50Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Parramatta

    NSW · 2150
    62Strong
    Median
    $1.50M
    5y growth
    6.7%/yr
    GrowthStable but fully priced
  2. Stafford

    QLD · 4053
    66Strong
    Median
    $945k
    5y growth
    11.8%/yr
    GrowthGrowth-led, low cashflow

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Parramatta
Stafford
Capital growth (5y)
weight 22%
676.7%/yr
10011.8%/yr
Rental yield
weight 13%
311.5%
402.0%
Rental demand
weight 10%
681.3%
731.1%
Population growth
weight 12%
656.5%
10010.0%
Income growth
weight 12%
6416.0%
7619.0%
Construction pipeline
weight 15%
100$25.0bn
0
Affordability
weight 8%
00% under cap
3737% under cap
Supply tightening
weight 8%
75-5.0% YoY
90-8.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Parramatta

    1/8
    • Construction pipeline
  2. Stafford

    7/8
    • Capital growth (5y)
    • Rental yield
    • Rental demand
    • Population growth
    • Income growth
    • Affordability
    • Supply tightening

Why Parramatta

Stable but fully priced

$25.0bn pipeline incl. Sydney Metro West — Parramatta, listings tightening 5.0% YoY.

Drivers
  • Infrastructure pipeline$25.0bn nearby
  • Supply tightening-5.0% YoY
  • Tight rentals1.3%
  • Capital growth6.7%/yr
Risks
  • At top of budget (100% of cap)
  • Thin gross yield (1.5%)

Construction ·Sydney Metro West — Parramatta0.0 kmConstruction · 2030

Why Stafford

Growth-led, low cashflow

11.8%/yr capital growth, population +10.0% (5y).

Drivers
  • Capital growth11.8%/yr
  • Population growth+10.0% (5y)
  • Supply tightening-8.0% YoY
  • Income growth+19.0% (5y)
Risks
  • Thin gross yield (2.0%)
  • No major construction project in this state

Construction ·Cross River Rail — Roma Street6.5 kmConstruction · 2026