Back to results

Seddon vs Box Hill vs Bulleen — which is best for growth?

Same eight metrics, scored against the same benchmark, ranked against a $1.50Mbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Seddon

    VIC · 3011
    57Average
    Median
    $965k
    5y growth
    0.1%/yr
    BalancedLate-cycle hold
  2. Box Hill

    VIC · 3128
    61Strong
    Median
    $1.50M
    5y growth
    5.8%/yr
    GrowthStable but fully priced
  3. Bulleen

    VIC · 3105
    58Average
    Median
    $1.30M
    5y growth
    3.4%/yr
    BalancedLate-cycle hold

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Seddon
Box Hill
Bulleen
Capital growth (5y)
weight 22%
10.1%/yr
585.8%/yr
343.4%/yr
Rental yield
weight 13%
502.5%
271.3%
371.8%
Rental demand
weight 10%
681.3%
651.4%
651.4%
Population growth
weight 12%
787.8%
787.8%
787.8%
Income growth
weight 12%
8421.0%
6416.0%
6416.0%
Construction pipeline
weight 15%
100$6.8bn
100$5.0bn
100$9.8bn
Affordability
weight 8%
3636% under cap
00% under cap
1313% under cap
Supply tightening
weight 8%
85-7.0% YoY
75-5.0% YoY
75-5.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Seddon

    5/8
    • Rental yield
    • Rental demand
    • Income growth
    • Affordability
    • Supply tightening
  2. Box Hill

    1/8
    • Capital growth (5y)
  3. Bulleen

    0/8

    No outright lead on any single dimension.

Why Seddon

Late-cycle hold

$6.8bn pipeline incl. West Gate Tunnel, listings tightening 7.0% YoY.

Drivers
  • Infrastructure pipeline$6.8bn nearby
  • Supply tightening-7.0% YoY
  • Income growth+21.0% (5y)
  • Population growth+7.8% (5y)
Risks
  • Thin gross yield (2.5%)
  • Modest 5y growth (0.1%/yr)

Construction ·New Footscray Hospital1.0 kmConstruction · 2026

Why Box Hill

Stable but fully priced

$5.0bn pipeline incl. Suburban Rail Loop East — Box Hill, population +7.8% (5y).

Drivers
  • Infrastructure pipeline$5.0bn nearby
  • Population growth+7.8% (5y)
  • Supply tightening-5.0% YoY
  • Tight rentals1.4%
Risks
  • At top of budget (100% of cap)
  • Thin gross yield (1.3%)

Construction ·Suburban Rail Loop East — Box Hill0.0 kmConstruction · 2035

Why Bulleen

Late-cycle hold

$9.8bn pipeline incl. North East Link — Bulleen, population +7.8% (5y).

Drivers
  • Infrastructure pipeline$9.8bn nearby
  • Population growth+7.8% (5y)
  • Supply tightening-5.0% YoY
  • Tight rentals1.4%
Risks
  • Thin gross yield (1.8%)
  • Modest 5y growth (3.4%/yr)

Construction ·North East Link — Bulleen1.1 kmConstruction · 2028