Back to results

Mooroopna vs Sunshine vs Moe — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $900kbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Mooroopna

    VIC · 3629
    56Average
    Median
    $395k
    5y growth
    9.8%/yr
    GrowthStable entry · room to scale
  2. Sunshine

    VIC · 3020
    68Strong
    Median
    $825k
    5y growth
    7.5%/yr
    GrowthStable but fully priced
  3. Moe

    VIC · 3825
    57Average
    Median
    $339k
    5y growth
    10.1%/yr
    GrowthStable entry · room to scale

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Mooroopna
Sunshine
Moe
Capital growth (5y)
weight 22%
989.8%/yr
757.5%/yr
10010.1%/yr
Rental yield
weight 13%
663.3%
432.1%
613.1%
Rental demand
weight 10%
402.4%
651.4%
402.4%
Population growth
weight 12%
787.8%
787.8%
787.8%
Income growth
weight 12%
5213.0%
6416.0%
5213.0%
Construction pipeline
weight 15%
0
100$9.1bn
0
Affordability
weight 8%
5656% under cap
88% under cap
6262% under cap
Supply tightening
weight 8%
25+5.0% YoY
80-6.0% YoY
25+5.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Mooroopna

    1/8
    • Rental yield
  2. Sunshine

    4/8
    • Rental demand
    • Income growth
    • Construction pipeline
    • Supply tightening
  3. Moe

    2/8
    • Capital growth (5y)
    • Affordability

Why Mooroopna

Stable entry · room to scale

9.8%/yr capital growth, population +7.8% (5y).

Drivers
  • Capital growth9.8%/yr
  • Population growth+7.8% (5y)
  • Rental yield3.3%
Risks
  • No major construction project in this state

Construction ·North East Link — Bulleen156.2 kmConstruction · 2028

Why Sunshine

Stable but fully priced

$9.1bn pipeline incl. Melbourne Airport Rail — Sunshine Hub, listings tightening 6.0% YoY.

Drivers
  • Infrastructure pipeline$9.1bn nearby
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Capital growth7.5%/yr
Risks
  • At top of budget (92% of cap)
  • Thin gross yield (2.1%)

Construction ·Melbourne Airport Rail — Sunshine Hub0.0 kmApproved · 2033

Why Moe

Stable entry · room to scale

10.1%/yr capital growth, population +7.8% (5y).

Drivers
  • Capital growth10.1%/yr
  • Population growth+7.8% (5y)
  • Budget headroom62% under cap
  • Rental yield3.1%
Risks
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley101.9 kmConstruction · 2035