Why Grafton
Watch supply easingpopulation +6.5% (5y), 2.9% gross yield.
- Population growth+6.5% (5y)
- Listings up 6.0% YoY — supply easing
- No major construction project in this state
Construction ·Parramatta Light Rail Stage 2494.3 kmApproved · 2031
Same eight metrics, scored against the same benchmark, ranked against a $900kbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.
Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.
Where each suburb leads the field, with the count of dimensions won.
No outright lead on any single dimension.
No outright lead on any single dimension.
population +6.5% (5y), 2.9% gross yield.
Construction ·Parramatta Light Rail Stage 2494.3 kmApproved · 2031
listings tightening 5.0% YoY, tight 1.3% vacancy.
Construction ·Sydney Metro West — Parramatta298.2 kmConstruction · 2030
listings tightening 5.0% YoY, tight 1.3% vacancy.
Construction ·Sydney Metro West — Parramatta299.3 kmConstruction · 2030