Why Howrah
Stable entry pointlistings tightening 5.0% YoY, tight 1.3% vacancy.
- Supply tightening-5.0% YoY
- Tight rentals1.3%
- Capital growth6.6%/yr
- No major construction project in this state
Construction ·Macquarie Point Stadium5.2 kmPlanned · 2029
Same eight metrics, scored against the same benchmark, ranked against a $900kbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.
Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.
Where each suburb leads the field, with the count of dimensions won.
No outright lead on any single dimension.
listings tightening 5.0% YoY, tight 1.3% vacancy.
Construction ·Macquarie Point Stadium5.2 kmPlanned · 2029
listings tightening 4.0% YoY, tight 1.3% vacancy.
Construction ·Royal Hobart Hospital — Stage 310.5 kmConstruction · 2026
8.2%/yr capital growth, listings tightening 4.0% YoY.
No material risk flags raised by the model.
Construction ·New Bridgewater Bridge3.6 kmConstruction · 2025