Back to results

Midway Point vs Wodonga vs Sunshine West — which is best for infrastructure?

Same eight metrics, scored against the same benchmark, ranked against a $900kbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Midway Point

    TAS · 7171
    48Average
    Median
    $645k
    5y growth
    7.0%/yr
    BalancedStable entry point
  2. Wodonga

    VIC · 3689
    63Strong
    Median
    $485k
    5y growth
    7.9%/yr
    BalancedStable entry · room to scale
  3. Sunshine West

    VIC · 3020
    53Average
    Median
    $670k
    5y growth
    1.1%/yr
    BalancedStable entry point

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Midway Point
Wodonga
Sunshine West
Capital growth (5y)
weight 22%
707.0%/yr
797.9%/yr
111.1%/yr
Rental yield
weight 13%
603.0%
603.0%
542.7%
Rental demand
weight 10%
681.3%
701.2%
651.4%
Population growth
weight 12%
313.1%
787.8%
787.8%
Income growth
weight 12%
5213.0%
8822.0%
6416.0%
Construction pipeline
weight 15%
0
0
77$3.8bn
Affordability
weight 8%
2828% under cap
4646% under cap
2626% under cap
Supply tightening
weight 8%
70-4.0% YoY
90-8.0% YoY
80-6.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Midway Point

    0/8

    No outright lead on any single dimension.

  2. Wodonga

    6/8
    • Capital growth (5y)
    • Rental yield
    • Rental demand
    • Income growth
    • Affordability
    • Supply tightening
  3. Sunshine West

    1/8
    • Construction pipeline

Why Midway Point

Stable entry point

7.0%/yr capital growth, listings tightening 4.0% YoY.

Drivers
  • Capital growth7.0%/yr
  • Supply tightening-4.0% YoY
  • Tight rentals1.3%
Risks
  • No major construction project in this state

Construction ·Macquarie Point Stadium18.6 kmPlanned · 2029

Why Wodonga

Stable entry · room to scale

listings tightening 8.0% YoY, incomes +22.0% (5y).

Drivers
  • Supply tightening-8.0% YoY
  • Income growth+22.0% (5y)
  • Capital growth7.9%/yr
  • Population growth+7.8% (5y)
Risks
  • No major construction project in this state

Construction ·North East Link — Bulleen243.4 kmConstruction · 2028

Why Sunshine West

Stable entry point

listings tightening 6.0% YoY, population +7.8% (5y).

Drivers
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Infrastructure pipeline$3.8bn nearby
  • Tight rentals1.4%
Risks
  • Modest 5y growth (1.1%/yr)

Construction ·Melbourne Airport Rail — Sunshine Hub1.4 kmApproved · 2033