Back to results

Morwell vs Ararat vs Baxter — which is best for yield?

Same eight metrics, scored against the same benchmark, ranked against a $900kbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Morwell

    VIC · 3840
    58Average
    Median
    $314k
    5y growth
    11.9%/yr
    GrowthStable entry · room to scale
  2. Ararat

    VIC · 3377
    57Average
    Median
    $330k
    5y growth
    8.9%/yr
    BalancedStable entry · room to scale
  3. Baxter

    VIC · 3911
    55Average
    Median
    $775k
    5y growth
    7.9%/yr
    GrowthGrowth-led, low cashflow

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Morwell
Ararat
Baxter
Capital growth (5y)
weight 22%
10011.9%/yr
898.9%/yr
797.9%/yr
Rental yield
weight 13%
713.6%
793.9%
482.4%
Rental demand
weight 10%
402.4%
402.4%
681.3%
Population growth
weight 12%
787.8%
787.8%
787.8%
Income growth
weight 12%
5213.0%
5213.0%
6416.0%
Construction pipeline
weight 15%
0
0
0
Affordability
weight 8%
6565% under cap
6363% under cap
1414% under cap
Supply tightening
weight 8%
25+5.0% YoY
25+5.0% YoY
80-6.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Morwell

    2/8
    • Capital growth (5y)
    • Affordability
  2. Ararat

    1/8
    • Rental yield
  3. Baxter

    3/8
    • Rental demand
    • Income growth
    • Supply tightening

Why Morwell

Stable entry · room to scale

11.9%/yr capital growth, population +7.8% (5y).

Drivers
  • Capital growth11.9%/yr
  • Population growth+7.8% (5y)
  • Rental yield3.6%
  • Budget headroom65% under cap
Risks
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley116.0 kmConstruction · 2035

Why Ararat

Stable entry · room to scale

8.9%/yr capital growth, 3.9% gross yield.

Drivers
  • Capital growth8.9%/yr
  • Rental yield3.9%
  • Population growth+7.8% (5y)
  • Budget headroom63% under cap
Risks
  • No major construction project in this state

Construction ·Melbourne Airport Rail — Sunshine Hub176.5 kmApproved · 2033

Why Baxter

Growth-led, low cashflow

listings tightening 6.0% YoY, 7.9%/yr capital growth.

Drivers
  • Supply tightening-6.0% YoY
  • Capital growth7.9%/yr
  • Population growth+7.8% (5y)
  • Tight rentals1.3%
Risks
  • Thin gross yield (2.4%)
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Cheltenham26.8 kmConstruction · 2035