Back to results

Morwell vs Longwarry vs Mambourin — which is best for growth?

Same eight metrics, scored against the same benchmark, ranked against a $900kbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Morwell

    VIC · 3840
    58Average
    Median
    $314k
    5y growth
    11.9%/yr
    GrowthStable entry · room to scale
  2. Longwarry

    VIC · 3816
    55Average
    Median
    $550k
    5y growth
    6.3%/yr
    BalancedStable entry point
  3. Mambourin

    VIC · 3024
    63Strong
    Median
    $574k
    5y growth
    11.7%/yr
    GrowthStable entry point

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Morwell
Longwarry
Mambourin
Capital growth (5y)
weight 22%
10011.9%/yr
636.3%/yr
10011.7%/yr
Rental yield
weight 13%
713.6%
623.1%
663.3%
Rental demand
weight 10%
402.4%
681.3%
651.4%
Population growth
weight 12%
787.8%
787.8%
787.8%
Income growth
weight 12%
5213.0%
6416.0%
6416.0%
Construction pipeline
weight 15%
0
0
0
Affordability
weight 8%
6565% under cap
3939% under cap
3636% under cap
Supply tightening
weight 8%
25+5.0% YoY
80-6.0% YoY
80-6.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Morwell

    2/8
    • Rental yield
    • Affordability
  2. Longwarry

    1/8
    • Rental demand
  3. Mambourin

    0/8

    No outright lead on any single dimension.

Why Morwell

Stable entry · room to scale

11.9%/yr capital growth, population +7.8% (5y).

Drivers
  • Capital growth11.9%/yr
  • Population growth+7.8% (5y)
  • Rental yield3.6%
  • Budget headroom65% under cap
Risks
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley116.0 kmConstruction · 2035

Why Longwarry

Stable entry point

listings tightening 6.0% YoY, population +7.8% (5y).

Drivers
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Tight rentals1.3%
  • Income growth+16.0% (5y)
Risks
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley58.6 kmConstruction · 2035

Why Mambourin

Stable entry point

11.7%/yr capital growth, listings tightening 6.0% YoY.

Drivers
  • Capital growth11.7%/yr
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Rental yield3.3%
Risks
  • No major construction project in this state

Construction ·Melbourne Airport Rail — Sunshine Hub23.7 kmApproved · 2033