Back to results

Traralgon vs Bunyip vs Moe — which is best for growth?

Same eight metrics, scored against the same benchmark, ranked against a $900kbudget. Look for where one suburb is materially ahead — that's the dimension that should sway your call.

  1. Traralgon

    VIC · 3844
    54Average
    Median
    $533k
    5y growth
    10.3%/yr
    GrowthStable entry · room to scale
  2. Bunyip

    VIC · 3815
    54Average
    Median
    $705k
    5y growth
    7.1%/yr
    GrowthGrowth-led, low cashflow
  3. Moe

    VIC · 3825
    57Average
    Median
    $339k
    5y growth
    10.1%/yr
    GrowthStable entry · room to scale

Metric breakdown

Each row scores 0–100 against a fixed benchmark. The leader on each row is highlighted.

Metric · weight
Traralgon
Bunyip
Moe
Capital growth (5y)
weight 22%
10010.3%/yr
717.1%/yr
10010.1%/yr
Rental yield
weight 13%
542.7%
472.4%
613.1%
Rental demand
weight 10%
402.4%
681.3%
402.4%
Population growth
weight 12%
787.8%
787.8%
787.8%
Income growth
weight 12%
5213.0%
6416.0%
5213.0%
Construction pipeline
weight 15%
0
0
0
Affordability
weight 8%
4141% under cap
2222% under cap
6262% under cap
Supply tightening
weight 8%
25+5.0% YoY
80-6.0% YoY
25+5.0% YoY

Winner per dimension

Where each suburb leads the field, with the count of dimensions won.

  1. Traralgon

    0/8

    No outright lead on any single dimension.

  2. Bunyip

    3/8
    • Rental demand
    • Income growth
    • Supply tightening
  3. Moe

    2/8
    • Rental yield
    • Affordability

Why Traralgon

Stable entry · room to scale

10.3%/yr capital growth, population +7.8% (5y).

Drivers
  • Capital growth10.3%/yr
  • Population growth+7.8% (5y)
Risks
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley124.0 kmConstruction · 2035

Why Bunyip

Growth-led, low cashflow

listings tightening 6.0% YoY, population +7.8% (5y).

Drivers
  • Supply tightening-6.0% YoY
  • Population growth+7.8% (5y)
  • Capital growth7.1%/yr
  • Tight rentals1.3%
Risks
  • Thin gross yield (2.4%)
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley54.3 kmConstruction · 2035

Why Moe

Stable entry · room to scale

10.1%/yr capital growth, population +7.8% (5y).

Drivers
  • Capital growth10.1%/yr
  • Population growth+7.8% (5y)
  • Budget headroom62% under cap
  • Rental yield3.1%
Risks
  • No major construction project in this state

Construction ·Suburban Rail Loop East — Glen Waverley101.9 kmConstruction · 2035